Taqania

Logistics · Strategic Advisory

Restructuring and rescoping a 3-year tech platform plan

Large programs accumulate tracks that address challenges already solved by other systems; we identify these duplications before budgets are approved.

Illustrative examples simulating real-world scenarios; designed to showcase engineering methodology, analysis style, and target outcomes with precision and transparency.

What we would target

18 monthsRationalized timeline instead of 36 months
2 out of 5Tracks eliminated to prevent redundant spending
4 weeksDuration of the independent technical audit

The problem

A 3-year logistics platform build program whose estimated cost doubled during planning; the organization requires an independent assessment before final budget approval.

What we would do

  • A fixed-fee assessment of all five workstreams, cross-referencing them against the actual reality of the infrastructure.
  • Discovering two tracks addressing issues already resolved by existing subsystems, which had not been reflected in the project documentation.
  • Restructuring the remaining three tracks with specific owners, clear delivery phases, and explicit stop points.

The point of it

Accumulating unnecessary scope is common in major projects; engaging independent engineering advice protects budgets from waste.

Tell us what you are trying to solve.

Share the operational challenge and the regulatory or technical constraints you are working within. A consultant replies within two working days, in Arabic or English.